Industrial Warehouse in Rockingham Logistics Hub, Corby

  • Finished:November 2019
  • Duration:8 weeks

Reinforced concrete slabs were used to construct the floor for this 1350 sqm car preparation facility in Rockingham Logistics Hub. Site preparation was an essential step and several ground works were carried out before pouring the concrete, including site levelling, as well as sewer pipes and electrical conduit being put in place.